General News
Asogli to resume power production
The Sunon Asogli Power Plant is expected to resume power production as soon as it receives gas supplies from Nigeria. The plant, which produces 180 megawatts (MW) of power, was shut down last Saturday following a strike by workers of the Nigeria National Petroleum Corporation (NNPC).
27 May 2015